翻訳と辞書
Words near each other
・ Line 14, Beijing Subway
・ Line 14, Guangzhou Metro
・ Line 14, Shanghai Metro
・ Line 15
・ Line 15 (São Paulo Metro)
・ Line 15, Beijing Subway
・ Line 15, Shanghai Metro
・ Line 16
・ Line 16 (São Paulo Metro)
・ Line 16, Beijing Subway
・ Line 16, Shanghai Metro
・ Line 16, Shanghai Metro (old)
・ Line 17
・ Line 17 (Stockholm metro)
・ Line 17 (São Paulo Metro)
Line 17, Beijing Subway
・ Line 17, Shanghai Metro
・ Line 17, Shanghai Metro (old)
・ Line 18
・ Line 18 (Stockholm metro)
・ Line 18 (São Paulo Metro)
・ Line 18, Shanghai Metro
・ Line 19
・ Line 19 (Stockholm metro)
・ Line 19, Beijing Subway
・ Line 19, Shanghai Metro
・ Line 2
・ Line 2 (Athens Metro)
・ Line 2 (Budapest Metro)
・ Line 2 (Madrid Metro)


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Line 17, Beijing Subway : ウィキペディア英語版
Line 17, Beijing Subway

Line 17 of the Beijing Subway (), also known by its codename, Line R2 (),〔(Chinese) ("北京再规划建设3号、12号、R2线三条新地铁线路" 中国质量新闻网 ) 2012-06-16〕 is an express rapid transit rail line under planning in Beijing.〔http://news.china.com/domestic/945/20150720/20044694.html〕 Line 17 is planned to run parallel and to the east of Line 5 from the Future Technology City in Changping District to Yizhuang in Daxing District.〔〔 The line is expected to have a total length of .〔 With stations every 2.5 km and trains operating up to 100km/h, Line 17 will be Beijing's first north south express line. Line 17 is planned to utilize 8 car high capacity wide body A size trains.〔 The northern-most section from Changping to Wangjing West may open in 2015, with the rest of the line to follow by 2020.〔
==History==
In January 2011, an official with the city's planning committee indicated that Line 17 of the Subway was planned to run east-west through the city's Central Business District under Guanghua Road with transfers to Lines 4 and 5.〔(Chinese) (Roll.sohu.com ) "CBD核心区地铁17号线地下步道规模空前" ''中证网'' 2011-01-17〕 In February 2012, the city's planning committee identified a different Line 17, code-named R2, as a line planned for 2020, that would run north-south from Tiantongyuan to Yizhuang that would run parallel and to the east of Line 5.〔(Chinese) ("北京轨道交通有望添6条新线 12号线缓三环拥堵" 京华时报 ) 2012-02-14〕 On June 15, 2012, the city government disclosed tentatively planned stations for the R2 Line including:〔〔(Chinese) ("北京将再增3条新地铁" 《新京报》 ) 2012-06-16〕〔(Chinese) ( "北京将再增3条新地铁" 新京报 ) 2012-06-16〕〔
#North District of Future Technology City 未来科技城北区
#South District of Future Technology City 未来科技城南区
#Tiantongyuan 天通苑
#Wangjing West 望京西 &
#Taiyanggong 太阳宫 &
#Workers' Stadium 工人体育场
#Dongdaqiao 东大桥
#Yong'anli 永安里
#Guangqumenwai 广渠门外
#Panjiayuan 潘家园
#Shilihe 十里河 &
On October 10, 2013, city authorities confirmed that Line 17 is in fact Line R2 and would run from the Future Technology City in Changping District to Yizhuang in Daxing District.〔 Construction was expected to begin in 2014 and Line 17 would have a total length of .〔(Chinese) ("北京地铁17号线有望明年开建 从昌平至亦庄" ''新京报'' ) 2013-10-10〕 The northern section of Line 17, with six stations from the Future Technology City to Wangjing West, may open as early as 2015, with the rest of the line to follow in 2020.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Line 17, Beijing Subway」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.